Home / buying guide / Documents Required to Buy Property in Gurgaon: The Checklist We Use

Documents Required to Buy Property in Gurgaon: Three Different Checklists, Because a Plot Is Not a Flat

By Neev Realty•20 August 2026
Share this story

Table of Contents

▼

Almost every property dispute we have watched unfold in Gurugram traces back to a document somebody did not ask for. Not a document that was forged — one that simply was not produced, and nobody pushed.

The checklist below is the one we work through. It is deliberately organised by what you are buying, because the documents for a builder's new flat, a resale apartment and a plot are genuinely different, and using the wrong list is how people miss things.

Before anything else: two online checks that take ten minutes

Do these before you visit, not after you have paid a booking amount.

  1. HARERA registration. Every project that needs registration has a number. Look it up on the Haryana RERA site — the Gurugram bench publishes at hareraggm.gov.in — and check the registered project details against what the sales office told you. Also look at the promoter's complaint history while you are there. It is public and it is informative.
  2. The current circle rate for the sector. Haryana's 2026-27 collector rates took effect on 1 April 2026, and stamp duty is charged on the higher of your price or the circle rate. Around 11 percent of Gurugram's area saw increases of up to 75 percent in that revision. Knowing your sector's number before you negotiate changes what you offer.

If you are buying a new flat from a builder

Document What you are checking
HARERA registration certificate for the phase That your specific tower and phase is registered, not just the project name. Phased developments register phase by phase.
Licence from the town and country planning department That the colony is licensed at all, and for the land parcel your tower sits on
Approved building plan and layout That the tower being built matches what was sanctioned
Title documents for the land That the developer owns or has development rights over the parcel
Builder-buyer agreement The whole document, before you pay - see below
Allotment letter and payment plan Milestones, and what triggers each demand
Occupancy certificate Only for ready property. No OC means the building is not legally fit for occupation, whatever the possession letter says.

The builder-buyer agreement is the document, not a formality

People sign it after paying twenty percent. Read it before. Five clauses do most of the work:

  • The possession date, and the penalty for delay — and check whether the penalty is symmetric with what you pay if you delay a payment. Frequently it is not.
  • Carpet area versus super area, stated in numbers. RERA requires carpet area disclosure. Your rate per square foot is usually quoted on super area, which includes your share of lobbies and the clubhouse.
  • What happens if the area changes on final measurement, and whether there is a tolerance band.
  • The specification schedule — the actual list of what goes into the flat. "Premium fittings" is not a specification.
  • Transfer or assignment charges, if you might sell before possession. Ask for the figure now.

If you are buying a resale apartment

Different risk profile entirely. Here the building exists and the question is whether the seller can actually convey it to you.

Document What you are checking
Original sale deed of the current owner That the seller is the registered owner. Insist on the original, not a photocopy.
Chain of title / previous sale deeds An unbroken ownership chain back through prior owners
Encumbrance certificate No pending mortgage, loan or charge. Get at least fifteen years.
Occupancy certificate The building was completed as sanctioned and is fit for habitation
Approved building plan That no unauthorised alteration has been made to the flat or the block
Property tax receipts, up to date No accumulated municipal dues that follow the property
Maintenance no-dues certificate from the society or builder Outstanding maintenance is a very common nasty surprise at handover
Utility clearances - electricity and water Same reason
Loan closure and NOC, if the seller had a mortgage That the bank has released its charge. The original deed is usually with the bank until it does.
Builder's NOC for transfer, where the society is not yet formed Many Gurugram societies still transfer through the developer, who charges for it

One practical note: if the seller cannot produce the original sale deed and says it is with the bank, that is normal and fine — but it means the loan is live and the closure has to be sequenced into your payment. Do not let anyone hand-wave that step.

If you are buying a plot

The heaviest diligence of the three, and the one where people most often skip steps because a plot feels simpler than a building. It is not.

  1. Licence number and layout approval for the colony from the town and country planning department. No licence, no legal colony.
  2. Change of Land Use certificate. A great deal of land marketed for housing at the district edges is still classified as agricultural. Without the CLU you are buying farmland with a brochure attached.
  3. Jamabandi and mutation records at the local tehsil, confirming the seller is the recorded owner and the revenue chain is continuous.
  4. Encumbrance certificate, fifteen years minimum.
  5. HARERA registration, if a developer is involved in the plotted colony. Unregistered plotted colonies are common in this belt.
  6. Demarcation on site. Physically walk the plot with the layout plan. Plot numbering on paper and pegs in the ground do not always agree.

Our plots versus flats comparison covers why this diligence gap exists and whether the format is right for you at all.

What you personally need to produce

Straightforward, but people leave it to the last week and then delay their own registry:

  • PAN and Aadhaar for every buyer named on the deed
  • Passport-size photographs
  • Proof of the source of funds, and your loan sanction letter if financing
  • Form 26QB and the TDS challan — you deduct 1 percent under Section 194-IA where the consideration is Rs 50 lakh or more, and the threshold counts parking, club and similar add-ons. This is the buyer's obligation, not the seller's, and it is the one buyers most often discover late.
  • Two witnesses with ID for the registration appointment

If the seller is an NRI, the TDS position is entirely different — deduction under Section 195 on the whole consideration rather than 1 percent on the gain, and you will need a TAN to do it. We explain that in our capital gains guide, and it needs to be sorted out weeks before registration.

After registration: the step half of buyers skip

Mutation. Registering the sale deed transfers ownership; mutation updates the municipal or revenue record to show you as the owner. Until it is done, tax bills and utility records still name the previous owner.

It should be initiated promptly — the working guidance is within about ninety days of registering the deed — through the MCG for municipal property or the Jamabandi portal for revenue records. Skipping it causes property tax disputes and utility transfer delays years later, at which point it is much harder to fix.

The costs, so the budget is real

Item Amount
Stamp duty 7 percent for a male buyer, 5 percent for a female buyer, on the higher of price or circle rate
Registration fee Slab-based, capped at Rs 50,000
GST 5 percent on under-construction non-affordable, 1 percent on affordable, both with no input credit. Nil on completed property with a certificate and on resale.
TDS (Section 194-IA) 1 percent where consideration is Rs 50 lakh or more, resident seller

Full working in our Gurgaon registry charges guide. The female-buyer point is worth repeating: on a Rs 2 crore purchase, that two percentage points is Rs 4 lakh.

Our actual view

The single highest-value habit is asking for documents before you pay a booking amount rather than after. Once money has moved, the conversation changes — you are no longer a prospect being courted, you are a buyer who has already committed, and requests that would have been answered in a day start taking three weeks.

The second is to have a lawyer read the title chain on anything other than a first-sale flat from a large developer. It costs a fraction of one percent of the transaction and it is the only part of this list you cannot sensibly do yourself.

If you want, send us the project or the resale unit you are considering and we will tell you which of these documents to ask for first, and which of them tends to be missing in that particular building. Nothing here is legal advice — see our disclaimer.

Related reading

Frequently Asked Questions

Everything you need to know about this topic.

For a new flat from a builder: the HARERA registration certificate for your specific tower and phase rather than the project name, the town and country planning licence, the approved building plan and layout, the developer's title documents for the land, the full builder-buyer agreement, the allotment letter and payment plan, and the occupancy certificate if the property is ready. No occupancy certificate means the building is not legally fit for occupation, whatever the possession letter says.
A resale purchase is about whether the seller can actually convey the property. Ask for the original sale deed rather than a copy, the chain of previous sale deeds, an encumbrance certificate covering at least fifteen years, the occupancy certificate, the approved building plan to confirm no unauthorised alteration, up-to-date property tax receipts, a maintenance no-dues certificate, utility clearances, the loan closure NOC if the seller had a mortgage, and the builder's NOC for transfer where the society is not yet formed.
Look the project up on the Haryana RERA site - the Gurugram bench publishes at hareraggm.gov.in - and check the registered details against what the sales office told you. Verify that your specific tower and phase carries the registration, because phased developments register phase by phase and the number on the brochure may belong to a different phase. While you are there, review the promoter's complaint history, which is public and often more informative than the registration itself.
Yes, and roughly half of buyers skip it. Registering the sale deed transfers ownership; mutation updates the municipal or revenue record to show you as the owner. Until it is done, tax bills and utility records still name the previous owner. It should be initiated promptly - the working guidance is within about ninety days of registration - through the MCG for municipal property or the Jamabandi portal for revenue records. Skipping it causes property tax disputes and utility transfer delays that are much harder to fix later.
PAN and Aadhaar for every buyer named on the deed, passport-size photographs, proof of source of funds and your loan sanction letter if financing, two witnesses with ID for the registration appointment, and Form 26QB with the TDS challan. That last one is the buyer's obligation and the one most often discovered late: you deduct 1 percent under Section 194-IA where consideration is Rs 50 lakh or more, and the threshold counts parking, club and similar add-ons.
Six things, and plots need heavier diligence than flats despite feeling simpler. The colony's licence number and layout approval from the town and country planning department. The Change of Land Use certificate, since much land marketed for housing at the district edges is still agricultural. Jamabandi and mutation records at the local tehsil confirming a continuous revenue chain. An encumbrance certificate covering fifteen years. HARERA registration if a developer is involved. And physical demarcation on site, walked with the layout plan in hand.